Analysis Of The Bangkir Moving Dam As A Flood Control Measure In The Indramayu Regency Area
Farrel Arkananta, Riyanto and Mashadi, Putra and Kahfi Anwar, Ghiffary and Nurdiyanto, Nurdiyanto (2025) Analysis Of The Bangkir Moving Dam As A Flood Control Measure In The Indramayu Regency Area. Journal of World Science, 4 (10): 11. pp. 1-10. ISSN 288-8726
Abstract.pdf
Restricted to Repository staff only until 25 October 2030.
Download (285kB)
Abstract
This study analyzes the capacity of the Bangkir Movable Dam as a strategic solution to control flooding downstream of the Cimanuk River in Indramayu, which often occurs due to river overflow. This quantitative study uses rainfall data over a 10-year period (2015–2024) to calculate the design flood discharge, with the Weduwen method selected as the primary reference due to its most conservative estimates. The analysis results determine the 50-year return period flood discharge (Q50) at 599.58 m³/s. Meanwhile, the total dam capacity, calculated using the Sharp-Crested Weir method, reaches 1,329.68 m³/s. The comparison shows that the existing dam capacity is significantly larger than the planned flood discharge. Thus, the Bangkir Movable Weir is considered effective and capable of controlling floods for a return period of up to 100 years, thereby reducing the risk of flooding in the Indramayu region.
| Item Type: | Article |
|---|---|
| Subjects: | Q Science > Q Science (General) |
| Divisions: | Fakultas Teknik > Teknik Sipil |
| Depositing User: | Farrel Arkananta Riyanto |
| Date Deposited: | 24 Feb 2026 04:26 |
| Last Modified: | 24 Feb 2026 04:26 |
| URI: | https://eprints.ugj.ac.id/id/eprint/3146 |
