Login | Create Account

Analysis Of The Bangkir Moving Dam As A Flood Control Measure In The Indramayu Regency Area

Farrel Arkananta, Riyanto and Mashadi, Putra and Kahfi Anwar, Ghiffary and Nurdiyanto, Nurdiyanto (2025) Analysis Of The Bangkir Moving Dam As A Flood Control Measure In The Indramayu Regency Area. Journal of World Science, 4 (10): 11. pp. 1-10. ISSN 288-8726

[thumbnail of JOURNAL OF WORLD SCIENCE (JWS)] Text (JOURNAL OF WORLD SCIENCE (JWS))
Abstract.pdf
Restricted to Repository staff only until 25 October 2030.

Download (285kB)
Official URL: https://jws.rivierapublishing.id/index.php/jws/art...

Abstract

This study analyzes the capacity of the Bangkir Movable Dam as a strategic solution to control flooding downstream of the Cimanuk River in Indramayu, which often occurs due to river overflow. This quantitative study uses rainfall data over a 10-year period (2015–2024) to calculate the design flood discharge, with the Weduwen method selected as the primary reference due to its most conservative estimates. The analysis results determine the 50-year return period flood discharge (Q50) at 599.58 m³/s. Meanwhile, the total dam capacity, calculated using the Sharp-Crested Weir method, reaches 1,329.68 m³/s. The comparison shows that the existing dam capacity is significantly larger than the planned flood discharge. Thus, the Bangkir Movable Weir is considered effective and capable of controlling floods for a return period of up to 100 years, thereby reducing the risk of flooding in the Indramayu region.

Item Type: Article
Subjects: Q Science > Q Science (General)
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Farrel Arkananta Riyanto
Date Deposited: 24 Feb 2026 04:26
Last Modified: 24 Feb 2026 04:26
URI: https://eprints.ugj.ac.id/id/eprint/3146

Actions (login required)

View Item
View Item