Time Analysis on the Kuningan Eastern Ring Road
Sigit, Widiyatmo Prasetyo and Dicky, Darmawan and Dinda, Firdaus and Aryati, Indah Kusumastuti (2025) Time Analysis on the Kuningan Eastern Ring Road. Indonesian Journal of Advanced Research (IJAR), 4 (12). pp. 2673-2688. ISSN 2986-0768
_IJAR_Sigit+Widiyatmo+Prasetyo_2673-2688.pdf
Restricted to Repository staff only until 31 December 2030.
Download (473kB)
Abstract
This analysis aims to identify delay factors and reduce the risk of delay in construction projects using the CPM method in the construction project of the East Ring Road Kuningan. The results of the study show that common factors that can have an impact on delays include the provision of materials, workforce readiness, and schedule adjustment to weather conditions. Therefore, supervision and control on critical routes must be carried out intensively to ensure that the project can be completed on time according to plan because delays in one activity alone will have a direct impact on the overall project completion.
| Item Type: | Article |
|---|---|
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | Fakultas Teknik > Teknik Sipil |
| Depositing User: | sigit widiyatmo prasetyo |
| Date Deposited: | 17 Mar 2026 04:06 |
| Last Modified: | 17 Mar 2026 04:06 |
| URI: | https://eprints.ugj.ac.id/id/eprint/3252 |
