Login | Create Account

Analysis Of The Construction Time Of The Cilutung Sumedang Bridge – Majalengka

Aditya Nurfikri, Julistitian and Muhammad, Asif and Melvin, Solehudin and Aryati, Indah Kusuma (2025) Analysis Of The Construction Time Of The Cilutung Sumedang Bridge – Majalengka. JWS (Journal of World Science), 4 (7). pp. 1-8. ISSN 2828-8726,2828-9307

[thumbnail of ANALISIS MANAJEMEN WAKTU KONSTRUKSI JEMBATAN CILUTUNG SUMEDANG - MAJALENGKA] Text (ANALISIS MANAJEMEN WAKTU KONSTRUKSI JEMBATAN CILUTUNG SUMEDANG - MAJALENGKA)
JURNAL ANALISA MENKOS PEMBANGUNAN JEMBATAN CILUTUNG SUMEDANG MAJALENGKA.pdf
Restricted to Repository staff only until 25 October 2030.

Download (403kB)
Official URL: https://jws.rivierapublishing.id/index.php/jws/art...

Abstract

Project management is the process of managing limited resources in an efficient, effective, and timely way to complete a project according to a predetermined plan. The three main functions in project management include the planning, execution, and control processes. This control includes the management of various project resources such as manpower, equipment, materials, and methods used. In order to achieve optimal project performance results in the construction work of the Cilutung Bridge, various analyses were carried out aimed at supporting the smooth implementation of the project in accordance with the plan. In this study, the analysis applied is to calculate the volume of work, implementation planning, and estimate the needs of labor, materials, and equipment, accompanied by the preparation of an s-curve and the analysis of the critical path CPM (Critical Path Method) as an analysis step to assess the performance of the project to ensure its implementation is on schedule and achieve optimal conditions. The results of the study show that from the results of the calculation of the volume of work in the Cilutung Sumedang – Majalengka Bridge Construction Project is 12257.813 m3. Then using CPM (Critical Path Method) analysis takes 72 days or equal to 18 weeks.

Item Type: Article
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: AdityaNurfikri Julistitian
Date Deposited: 09 Apr 2026 09:31
Last Modified: 09 Apr 2026 09:31
URI: https://eprints.ugj.ac.id/id/eprint/3278

Actions (login required)

View Item
View Item