Login | Create Account

Construction Management Analysis Of Cikeruh Steel Box Girder Bridge Project Spanning 80m Cirebon-Bandung Highway Majalengka Regency

dion, iskandar and dynia, s.alfitri and fadli, fahrizal and saihul, anwar (2026) Construction Management Analysis Of Cikeruh Steel Box Girder Bridge Project Spanning 80m Cirebon-Bandung Highway Majalengka Regency. Injurity, 5 (1): 186. pp. 18-25. ISSN 2963-4113

[thumbnail of Construction Management Analysis Of Cikeruh Steel Box Girder Bridge Project Spanning 80m Cirebon-Bandung Highway Majalengka Regency] Text (Construction Management Analysis Of Cikeruh Steel Box Girder Bridge Project Spanning 80m Cirebon-Bandung Highway Majalengka Regency)
INJURITY+Dion+Iskandar+18-25.pdf
Restricted to Repository staff only until 23 June 2031.

Download (523kB)
Official URL: https://injurity.pusatpublikasi.id/index.php/inj/a...

Abstract

This study aims to analyze the construction management of the 80-meter Cikeruh Steel Box Girder Bridge Project on the Cirebon-Bandung Highway in Majalengka Regency, which replaces the old bridge due to structural aging and increased vehicle load intensity.This construction management analysis includes calculating the volume of work, estimating the budget plan (Rencana Anggaran Biaya[RAB]), and scheduling project implementation. The research method is qualitative, employing direct observation, interviews, and literature study techniques. The data collected include primary data (field technical data and working drawings) and secondary data (location maps, unit price analysis, and unit prices). The Analisis Harga Satuan Pekerjaan(AHSP) used in this study is the 2024 Majalengka Regency AHSP. The results of the main work volume calculations show a bore pile volume of 89.49m3, a pile cap volume of 134.4m3, a column volume of 50.2656m3, and a pier head volume of 56m3. Based on the RAB calculations, the total cost required to complete the project is IDR 31,149,328,054.56. The work schedule was analyzed using bar charts and an S-curve. This study provides a comprehensive overview of the essential aspects of volume, cost, and time in bridge construction project management.

Item Type: Article
Subjects: T Technology > TH Building construction
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: fadli fahrizal
Date Deposited: 23 Jun 2026 07:08
Last Modified: 23 Jun 2026 07:08
URI: https://eprints.ugj.ac.id/id/eprint/3385

Actions (login required)

View Item
View Item